LATEST DORIS NEWS - UK Construction trials Doris "North of the Border" |
|
UK Construction conducted field trials in January 2008 comparing Doris to the conventional shot blast system currently used.
A 36" butt weld (left) was specially set up on a Land and Marine site at Kirriemuir in Scotland.
The comparative test was then carried out on site; the test was
witnessed by a qualified Senior Pipeline Inspector Stephen
Moorhead who prepared a report on the trial.
Once the trial was completed a close out meeting was held to
summarise the findings. |
36" Butt Weld at Kirriemuir
(Mouseover image for before and after) |
|
 |
Operations Performance Development Team trials Doris |
This trial assessed The DORIS blast cleaning method (which is self contained as a small & light weight unit) by making a comparison of;
- transportation,
- set up,
- connectivity of separate pieces,
- using different blast materials ie
- Crushed glass on steel pipes,
- fine crushed glass on concrete support structures
- fine crushed glass & water combination on Graffiti on a Cellette GRP simulated brick kiosk.

|
|
Above ground pipework Shustoke AGI
(Mouseover for results)
|
 |
|
|